Had a go with some production this weekend. It takes some time to make alot, when I only have 1 mold. It takes approx 10 minutes from pouring to demolding. And I pour some shads inbetween. With 2 molds I think the rate will be suitalble for me :) This weekend I only made these because my back said enough. With a better workbecnh, I will do better.
mandag 12. mars 2012
Abonner på:
Legg inn kommentarer (Atom)
Ingen kommentarer:
Legg inn en kommentar